The Nisichawayasihk Cree Nation – NNOC (Former High school) is now accepting bid quotations from qualified General and Roofing Contractors for the following Roofing Contract

Supply and Install Roofing Contract – Job# 2023-01 NCN/NNOC

Bid packages can be obtained at the NCN Trust Office by contacting Charlize Linklater or call (204) 484-2604 for assistance. For Contractor site access contact: Mike Cullen @ 204 679-6475

Bids will be accepted by Nora Thomas at the NCN Trust Office and must be submitted in the clearly marked envelope provided and submitted prior to the submission deadline date.

Electronic Tender packages can be downloaded below and submitted electronically to:
Nora Thomas (e-mail) norathomas@ncncree.com

Submission Deadline Date: 5:00 p.m. on February 9, 2023

Submissions after the Submission Deadline Date & time will not be accepted.

All or lowest bids not necessarily accepted. NCN shall have the right to disqualify Proponents from the bidding process if they have poor performance including failure to complete their obligations under any prior contract with NCN or have been involved in vexatious litigation with NCN.

Contractor Responsibilities and Liabilities:

A) Contractor responsible to review the tender package documentation and provide a complete bid package as required to ensure that your bid meets the qualifying criteria.
B) Contractor responsible to adhere to all applicable codes, regulations and maintain a clean and safe work environment.
C) Contractor responsible to remove all debris from work site and haul to the landfill site or area designated by the owner, in a timely manner and not allow the debris to accumulate on site or in the property.
D) Contractor responsible for the safety of all persons permitted on the site for the duration of the contract.
E) Contractor responsible to inform the NCN Commercial Properties and Claims Manager Mike Cullen (204) 679-6475 of any unsafe or health hazardous conditions that may arise as the work is being performed.
F) Any additional work that may arise from this report, will be negotiated between the contractor and the Designate appointed by the Owner.
G) All additional work or changes to the contract amount will be supported by an approved Change Order, prior to the contractor’s continuance of original contract.
H) Contractor responsible to provide all tools, safety equipment etc., required to perform the work.
I) Contractor will be held accountable for the actions of his employees and or any person or sub-contractor that the General Contractor grants access to the NCN Personal Care Home work site for the duration of the contract.
J) Contractor will be required to adhere to all regulations as per NCN Chief & Council and the PCH Executive Director Regitha Rajesh with respect to Covid-19 Pandemic.

SCOPE OF WORK:

1)Remove and dispose of shingles to local landfill site.

Supply and complete the following:

2) Perimeter ice and water shield.
3) Synthetic underlayment over roof sheathing.
4) 24 new attic vents. (Brown)
5) Mystique 42 shingles. (Brown)
6) Install ridge venting supplied by owner.

Please Note:  the Bid Submission package contains a detailed inspection report prepared by NSK Northern Engineering Ltd. which was completed on April 26, 2022.